Many folks wonder how long it takes if they need to replace a roof after removing the old one. But sadly, there is no single answer for this. There are different factors that impact the time duration of replacing a roof or installing a new roof. So, no professional from roofing companies in Santa Clarita can give you the exact time duration for completing this task. It’s difficult to tell how long it will take. But we see, on average, the time for a new roof replacement generally takes about 1-4 days or even longer than this if the weather is not good.
If you need your roof to have different materials, the time will vary in this case too. So, the type of roofing material you want also impacts the length of time taken for replacing a roof.
- In this blog, we will look at the factors that will affect the time duration:
Roofing installation is a complex and laborious job. For a roof replacement, always hire roofing experts because these professionals are trained to do this type of job. Roof replacement is a dangerous job as it involves standing on your roof and fixing it. So, never try to do this job yourself since you may risk hurting yourself.
- What things impact the length of time for a roof replacement and removing the existing one?
- The size of the roof
The larger the roof you have, the longer time it will take for roof replacement in Los Angeles. A roofer will charge per square foot basis for roofing.
- Roofing Material
There are different materials that come for shingles. So, different materials will affect the time taken to replace a roof because some roofing materials are easy to replace while others can take more time.
- Asphalt shingles: 1 – 2 days (easy)
- Concrete tiles: 8-9 days (difficult)
- Wood tiles: 3-5 days (depending on the roof size)
- Slate Tiles: 6-7 days (difficult)
- Clay tile: 3-5 days
- Steel sheets: 3-4 days (average complexity)
- Weather conditions
The day when roof replacement has to be done also impacts the time taken for installing a new roof and removing the old one. If the temperature is too cold, very hot, snowy, the replacement process can’t be done. In case, it starts raining on the day of your roof replacement, you will have to wait until the roof dries out. So, when the weather is not favorable, it will add more time to your roof replacement process.
- How long does it take to remove the old or existing roof?
Before laying a new roof, the existing or damaged one has to be replaced. Roofing experts will generally take about one 1day or 2 days if the roof is large to tear it off or remove it. During a roof removing process, the roofing contractor in Downey will first tear off the old roof and remove all the debris to make a flat and clean surface for new roof installation.